User Guides
User Guide Overview
A complete operational guide for setup, rollout, day-2 operations, and troubleshooting.
This section is your practical runbook for operating outline-mcp.
Each page is written so a team can move from first setup to controlled production use without guessing hidden behavior.
How to use this section
Use this section in phases.
Phase 1: Connect and validate
Phase 2: Define safety boundaries
Phase 3: Operate at scale
First-week rollout plan
A practical first-week plan usually looks like this:
- Start one client in
readmode and validate discovery/read paths. - Enable
read,writefor a controlled workspace and validate update patterns. - Introduce safe update and lease patterns for concurrent agents.
- Enable delete paths only after your lifecycle policy is approved.
- Add CI validation with optional E2E for regression protection.
Following this sequence reduces risk while still moving quickly.